Topography put to optimum use
The water is directed to the powerhouse in the mountain's interior via a 3.2 km pressure tunnel and a 1.7 km pressure line, thereby utilising a gradient of almost 400 meters.
29 March 2012 Publication of 2011 annual results
9 May 2012 Annual General Meeting
Head office | Repower Via da Clalt 307 7742 Poschiavo T +41 81 839 7111 F +41 81 839 7299 www.repower.com info@repower.com |
Switzerland | Josefstrasse 225 8005 Zürich T +41 81 839 7000 F +41 81 839 7099 |
Talstrasse 10 7250 Klosters T +41 81 423 7777 F +41 81 423 7799 |
|
Glennerstrasse 22 7130 Ilanz T +41 81 926 2626 F +41 81 926 2630 |
|
Italy | Via Giulio Uberti 37 20129 Milano T +39 02 764 5661 F +39 02 764 56630 |
Germany | Freistuhl 3 44137 Dortmund T: +49 231 206 4060 F: +49 231 206 40696 |
Romania | Bd. Primăverii nr. 19-21, sector 1 011972 Bucureşti T +40 21 335 0935 F +40 21 335 0934 |
Czech Republic | Vodičkova 710/31 110 00 Praha 1 T +420 255 73 0200 F +420 255 73 0238 |
Bosnia and Herzegovina | Fra Andela Zvizdovica 1 9th Floor, Tower A 71000 Sarajevo T +387 33 942 300 |